Menu Schedule Links

Juneau Terminal Expansion Underway

September 22, 2009

A $20 million expansion and renovation of the Juneau International Airport terminal is underway. Another $40 million is being spent on the runway safety areas. The $20 million renovation includes a modern heating system that will replace oil fired boilers with clean energy. The electrically-powered ground source heat pump system taps geothermal energy, that is, energy extracted from heat stored in the earth.

Anne Sutton, KTOO – Juneau

Download Audio (MP3)

You can subscribe to APRN’s newsfeeds via email, podcast and RSS. Follow us on Facebook at and on Twitter @aprn.