FERC Concerns Slow Dam Project

A proposed hydroelectric project in Southcentral Alaska has drawn of comments from concerned Alaskans. The Susitna Watana dam is expected to provide Railbelt energy needs for a hundred years, but at what cost?

Listen for the full story

Download Audio

APTI Reporter-Producer Ellen Lockyer started her radio career in the late 1980s, after a stint at bush Alaska weekly newspapers, the Copper Valley Views and the Cordova Times. When the Exxon Valdez ran aground in Prince William Sound, Valdez Public Radio station KCHU needed a reporter, and Ellen picked up the microphone.
Since then, she has literally traveled the length of the state, from Attu to Eagle and from Barrow to Juneau, covering Alaska stories on the ground for the AK show, Alaska News Nightly, the Alaska Morning News and for Anchorage public radio station, KSKA
elockyer (at) alaskapublic (dot) org  |  907.550.8446 | About Ellen

Previous articleNew DNA Test Could Represent a ‘Revolution’ for Colon Cancer
Next articleShaeffer Cox Takes The Stand In Militia Trial