Crews Work To Restore Railroad Service

The Alaska Railroad is continuing flood repair work on damaged tracks north of Talkeetna. The recent floods have washed out a section of track south of Gold Creek at milepost 261 on the main line. Crews are working around the clock to repair the track and restore service north of Wasilla.

Listen for the full story

Download Audio

APTI Reporter-Producer Ellen Lockyer started her radio career in the late 1980s, after a stint at bush Alaska weekly newspapers, the Copper Valley Views and the Cordova Times. When the Exxon Valdez ran aground in Prince William Sound, Valdez Public Radio station KCHU needed a reporter, and Ellen picked up the microphone.
Since then, she has literally traveled the length of the state, from Attu to Eagle and from Barrow to Juneau, covering Alaska stories on the ground for the AK show, Alaska News Nightly, the Alaska Morning News and for Anchorage public radio station, KSKA
elockyer (at) alaskapublic (dot) org  |  907.550.8446 | About Ellen

Previous articleLegislators Focus On How Disabled, Elderly Residents Fared Southcentral Storms
Next articleSeward, Mat-Su Floods Slowly Receding