Preliminary Engineering Underway For Susitna Watana Dam

Preliminary engineering is underway for the proposed Susitna Watana hydro electric dam.  The state has hired Colorado based MWH Global to develop designs for the project, which would provide rail belt power.

Listen for the full story

Download Audio

Dan Bross is a reporter at KUAC in Fairbanks.

Previous articlePetersburg Voters To Decide On Creation Of New Southeast Borough
Next articleThe Coal Rush